For this task, a section had to be cut to show atleast 3 connections. As was shown on my hub page which i will reload, tha calculations done to get the correct bolt for proper junction fittings.
Following are the required drawings for this exercise:
Exercise 2---------------------------------------------------------------------------------------------------------------
RE-SUBMISSION
Exercise 2
References:
http://www.instructables.com/id/A-REBAR-TRELLIS-for-Home-and-Garden/step4/GEOMETRY-Diagonal-Bracing/
-------------------------------------------------------------------------------------------------------------------
Exercise 3
References:
Exercise 4
Nasreen Peters
209004800
Construction and Detailing 2
MIP Milestone 1 - CTD (Part B)
July 2011